Fu10 Day Watching 18 Install May 2026
Via the on-screen display (OSD), set a static IP (e.g., 192.168.1.100). Disable DHCP to prevent address changes mid-installation.
Run a shielded Cat6 cable (max 100m) for power over Ethernet (PoE) plus a separate BNC for analog fallback. Avoid running parallel to AC power lines. Phase 2: Power-On & Network (Steps 5-8) Step 5: Initial Boot Connect power. The FU10 will take ~45 seconds to initialize. Watch for the green LED (steady = good; flashing = SD card error). fu10 day watching 18 install
Attach a compatible CS-mount lens (recommended: 6-60mm varifocal for day watching). Ensure the sensor is clean. Use the included shim if back-focus is off. Via the on-screen display (OSD), set a static IP (e
